Whole-process engineering consulting-Other public construction projects-Zhejiang
Yangtze River Delta Smart Oasis (Phase I
The total construction area is approximately 139,000 square meters, of which the above-ground construction area is about 111,000 square meters. It mainly includes functions such as workshops, enterprise offices, and administrative offices. The building span is 8 to 9 meters of column grid. The maximum single building area is about 58,000 square meters, the maximum single span is 30.185 meters, and the maximum building height is 24 meters
Whole-process engineering consulting