Malawi Capital Airport M1 Highway Upgrading Project

Time:2025-10-09

The project involves the construction of a route with a total length of approximately 9.455 kilometers and a roadbed width of 22.1 meters. This includes:One medium bridge (crossing the Lingadzi River) with a length of 67 meters and a width of 25 meters.One grade separation bridge (crossing the 28th Area Railway) with a length of 33 meters and a width of 23.1 meters.Seventeen culverts.